Weekly Project Update – December 24, 2020

The following work is scheduled over the next three weeks:

Garden State Parkway Mileposts 140 to 143

On November 14, 2020, traffic on the Northbound Garden State Parkway between mileposts 140.9 and 142.1 was shifted to the left in a new traffic pattern. All existing travel lanes remain open, but lane widths have been reduced. 

On November 21, 2020, traffic on the Southbound Garden State Parkway between mileposts 141.0 and 142.2 was shifted to the left in a new traffic pattern. All existing travel lanes remain open, but lane widths have been reduced. 

On December 22, 2020, pothole repair work within project limits on the Northbound and Southbound Roadways was completed.

No work will be performed between December 25, 2020 and January 8, 2021. During this period, the Traffic Control Coordinator will be patrolling and inspecting Temporary Traffic Control Devices within project limits.

During NJTA Holiday Restrictions, no lane closings will be scheduled.

Bridge No. 140.2, GSP under Galloping Hill Road

No work planned.

Bridge No. 141.3, GSP over Route 22 EB

On December 15, 2020, demolition of the parapet and bridge deck in the work zone in the Southbound direction at Structure 141.3 began and will continue throughout the month of January. This work will not require lane closures at Route 22 EB.

On December 23, 2020, demolition of the parapet and bridge deck in the work zone in the Northbound direction at Structure 141.3 began and will continue throughout the month of January. This work will not require lane closures at Route 22 EB.

During NJDOT Holiday Restrictions, no lane closings will be scheduled on Route 22 EB.

No work will be performed between December 25, 2020 and January 8, 2021. During this period, the Traffic Control Coordinator will be patrolling and inspecting Temporary Traffic Control Devices within project limits.

Bridge No. 141.7, GSP over Morris Avenue (Route 82)

Installation of timber shielding and other temporary support structures under the bridge will continue throughout the month of January. This work may require periodic single lane closures on Route 82 from 7:00 AM to 3:00 PM.

During NJDOT Holiday Restrictions, no lane closings will be scheduled on Route 82.

No work will be performed between December 25, 2020 and January 8, 2021. During this period, the Traffic Control Coordinator will be patrolling and inspecting Temporary Traffic Control Devices within project limits.

Bridge No. 141.9, GSP over Route 22 WB

Installation of timber shielding and other temporary support structures under the bridge will continue throughout the week of January 11, 2021. This work may require periodic single lane closures on Route 22 WB from 8PM to 5AM.

On or about January 11, 2021, demolition of the parapet and bridge deck in the work zone in the Northbound and Southbound directions at Structure 141.9 will begin. This work will not require lane closures at Route 22 WB.

During NJDOT Holiday Restrictions, no lane closings will be scheduled on Route 22 WB.

No work will be performed between December 25, 2020 and January 8, 2021. During this period, the Traffic Control Coordinator will be patrolling and inspecting Temporary Traffic Control Devices within project limits.