Weekly Project Update – March 19, 2021

The following work is scheduled over the next three weeks:

Garden State Parkway Mileposts 140 to 143

On November 14, 2020, traffic on the Northbound Garden State Parkway between mileposts 140.9 and 142.1 was shifted to the left in a new traffic pattern. All existing travel lanes remain open, but lane widths have been reduced. 

On November 21, 2020, traffic on the Southbound Garden State Parkway between mileposts 141.0 and 142.2 was shifted to the left in a new traffic pattern. All existing travel lanes remain open, but lane widths have been reduced. 

Bridge No. 140.2, GSP under Galloping Hill Road

No work planned.

Bridge No. 141.3, GSP over Route 22 EB

On December 15, 2020, demolition of the parapet and bridge deck in the work zone in the Southbound direction at Structure 141.3 began and will continue throughout the month of March 2021. Periodic single lane closures on Route 22 EB from 10:00 AM to 2:00 PM may be required during demolition of concrete diaphragms at the South Abutment.

On or about March 22, 2021, abrasive blasting (surface preparation) and application of zinc primer on structural members at Structure 141.3 NB will begin. This work will not require lane closures.

Bridge No. 141.7, GSP over Morris Avenue (Route 82)

On or about March 22, 2021, installation of steel reinforcement for the bridge deck in Stage 1 at Structure 141.7 in the Northbound and Southbound directions will begin. This work will not require lane closures.

On or about March 22, 2021, installation of electrical conduit for new underbridge lighting and installation of temporary protection for existing underbridge lighting will begin. This work may require periodic single lane closures on Route 82 WB from 7:00 AM to 3:00 PM.

Bridge No. 141.9, GSP over Route 22 WB

On January 25, 2021, demolition of the parapet and bridge deck in the work zone in the Northbound and Southbound directions at Structure 141.9 began and will continue throughout the month of March. This work will not require lane closures on Route 22 WB.

On or about March 22, 2021, installation of the temporary supports and jacks for structural jacking at the South abutment of Structure 141.9 NB will begin. This work may require periodic single lane closures on Route 22WB from 8:00 AM to 3:00 PM.

Previous
Previous

Weekly Project Update – March 26, 2021

Next
Next

Weekly Project Update – March 12, 2021