NEW TRAFFIC PATTERN: SEPTEMBER 29, 2022

Construction will occur on the Garden State Parkway between mileposts 140 and 143 starting on September 29, 2022, at 10 PM, and lasting for approximately 8 months until May 2023.

  • All Northbound traffic lanes will be shifted to the right beginning at Interchange 138

  • The lanes will be of reduced width

It is anticipated that traffic impacts will be moderate during peak travel periods until motorists become accustomed and adjust to the new traffic pattern.

Variable message signs to alert motorists of the construction will be placed along the Northbound Roadway one week in advance of the planned construction start date.      

Motorists can call 511 from any phone from a hands-free device (Listen for the initial voice prompt and ask for traffic conditions. Motorists can ask for a specific Highway, City, or even a point of interest).  Information regarding this project is posted on our web site at www.GSP140to143.com. Residents of Union Township and Kenilworth Borough can monitor traffic conditions by accessing Turnpike webcams at http://www.njta.com/travel-resources/camera-list, and http://www.511nj.org/cameras.aspx.  Motorists can also download the SafeTrip App for the latest traffic Advisories.


Project:  New Jersey Turnpike Authority Contract P100.338 Bridge Deck and Median Reconstruction

Route/Direction/MP:  Northbound Garden State Parkway milepost 140 – 143 through Union Township and Kenilworth Borough, Union County

Municipality/County:  Union Township / Kenilworth Borough, Union County

Nature of work:  Bridge Deck and Median Reconstruction

Description of New Traffic Pattern:  Construction will occur on the Garden State Parkway between mileposts 140 and 143 starting on September 29, 2022, and lasting for approximately 8 months until May 2023. Over this period, the following construction and changes in traffic patterns will occur:

  • All Northbound traffic lanes will be shifted to the right beginning at Interchange 138.

  • The number of lanes will be reduced from 5 to 4 at Exit 140 and increased to 5 lanes again at the entrance ramp from Rt 82.

  • Lanes will be of reduced width

Proposed Start Date of New Traffic Pattern:  The new traffic pattern will begin on September 29, 2022, and continue through May 2023

Anticipated Traffic Impacts:  It is anticipated that traffic impacts will be moderate during peak travel periods until motorists become accustomed and adjust to the new traffic pattern.

Other Comments:  NJTA will advise motorists by Overhead Variable Message Signs approaching the construction area. Coordination with Union County and NJDOT is ongoing.

Next
Next

NEW TRAFFIC PATTERN: SEPTEMBER 2022